Duty of care in building design and construction
Contents |
[edit] Introduction
A duty of care to ensure that another party does not suffer unreasonable harm or loss can arise in the construction industry as a result of:
[edit] Contractual obligations
Contractual obligations can be express terms of the contract or implied terms. Terms may be implied as a matter of law (legislation of general application to all contracts) or as a matter of fact (the presumed intention of the parties).
Generally, the contractual obligation is a duty to perform services with reasonable skill and care, that is, to the standard of a reasonably competent professional. However, if an appointment is made on the basis of specialist capabilities, then the duty will be to perform services with the standard of care that would be expected from a reasonably competent specialist, rather than the standard of a general practitioner operating in that field.
On design and build projects (subject to the express terms of the contract) there is an implied term that the building will be fit for purpose. This duty exists provided there is reliance by the client on design decisions taken by the contractor, for example, there is no reliance if the client insists on a particular construction method which subsequently fails.
The 'fitness for purpose' obligation is not generally extended to designers unless the contract specifically provides for this (for example, if they have accepted obligations under a design and build contract).
The Defective Premises Act 1972 provides that a contractor building a residential dwelling or converting or enlarging an existing dwelling, has a duty to ensure that the building work '...is done in a workmanlike or, as the case may be, professional manner with proper materials and so that as regards the work the dwelling will be fit for habitation when completed'
A duty of care can be restricted (subject to the Unfair Contract Terms Act 1997) or extended by agreement, and contractual rights (but not obligations) can be assigned to other parties unless the contract specifically prohibits this.
NB: Other statutory duties may exist, for example in relation to waste handling, CDM, environmental protection and so on. Duties here may apply not only to contractors and consultants, but also to the client and workers. In addition, there is an implied duty to warn, if proposed works are likely to pose a danger.
[edit] Tort of negligence
A concurrent duty of care exists in tort of negligence unless the contract has specifically restricted this duty.
Contractors and consultants will generally owe a duty of care in tort to their clients and third parties to take reasonable care to avoid causing personal injury or damage to property (other than to the works themselves).
Consultants will normally also owe their clients a duty of care in tort for the quality of their work, but this duty is not generally be owed by contractors.
In the absence of a contract, contractor design liability may arise in tort by reason of a duty to warn. This arises when a reasonably competent contractor should have realised that a design or elements of the design were likely to be defective.
Purely economic loss is generally not recoverable in tort other than where the loss is consequential upon damage for which a duty is owed, or where there is an assumption of responsibility, special relationship or reliance.
[edit] Collateral warranties
The case of Murphy v Brentwood District Council made clear that there is no duty of care to subsequent purchasers in respect of latent defects as they are a purely economic loss. As a result, collateral warranties have emerged creating a contractual duty of care to a third party who is not party to the original contract. A typical example would be where an architect accepts a duty of care to the occupier of a development in relation to defects which may arise.
[edit] The Contracts (Rights of Third Parties) Act
The Contracts (Rights of Third Parties) Act 1999 enables third party rights to be created by a contract. This is seen by some to offer an alternative to collateral warranties.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.

























Comments
To start a discussion about this article, click 'Add a comment' above and add your thoughts to this discussion page.